Hydraulic archivos | Copisa

Archive

[vc_row][vc_column][iconlist][iconlist_item icon="map-marker"]Location: Huesca. Spain[/iconlist_item][/iconlist][vc_column_text] Execution of 725 m of galleries in prolongation of the existing ones in the dam involving drilling its abutments. Four horizontal galleries excavated in rock, two on each edge at levels 520 and 561. Excavation section 8.51 m2 measuring 2.2 m in width...

[vc_row][vc_column][iconlist][iconlist_item icon="map-marker"]Location: Barcelona. Spain[/iconlist_item][/iconlist][vc_column_text] Construction of a 16 km pipeline of diameter 1,400 mm in steel with spiral welding, nominal pressure 40 atm; 3.2 km piping diameter 400 mm in steel with spiral welding, nominal pressure 40 atm; a pumping station with four impulsion pumps of...

[vc_row][vc_column][iconlist][iconlist_item icon="map-marker"]Location: Mallorca. Spain[/iconlist_item][/iconlist][vc_column_text] Seawater desalination plant using the reverse osmosis system. Most relevant tasks: • Pumping of seawater using four DN 600 mm wells, 150 m in depth. • Three thousand metres of DN 800 mm polyester piping. • Intermediate pumping of seawater from a 400 m³ tank. • Three...

[vc_row][vc_column][iconlist][iconlist_item icon="map-marker"]Location: Barcelona. Spain[/iconlist_item][/iconlist][vc_column_text] The new sanitation system in Alto Maresme, to the north of Barcelona, consists of a pre-treatment plant, pumping station, one Wastewater Treatment Plant (WWTP) and collectors that connect the station to the WWTP. The municipalities that incorporate the sanitation network in question, are...

[vc_row][vc_column][iconlist][iconlist_item icon="map-marker"]Location: Teruel. Spain[/iconlist_item][/iconlist][vc_column_text]Includes the following components: • Dam. • Spillway. • Drains and intakes. • Pump stations. • Restoration of access road to Lechago. • Internal roads. • Administration buildings. • Environmental impact corrective measures. • Erosion protection. • Emergency plan. Dam on the Pancrudo River some 1,300 m upstream of the mouth of the river...

[vc_row][vc_column][iconlist][iconlist_item icon="map-marker"]Location: Teruel. Spain[/iconlist_item][/iconlist][vc_column_text] The project referred to consisted of work on two dams: enlargement of the Santolea dam and the Bridge dam. The Bridge dam was done first, filling the reservoir generated, in order then to deal with the enlargement of Santolea, while maintaining the...