Design and construction of the first stage of the new container terminal in the port of municipality of San Jose. Republic of Guatemala.

The project is to design and build the first stage of the new container terminal, which in turn is divided into two sections: firstly, drafting the Structural Plan for the wharf, Concourse and Facilities, and then secondly building them.


The Terminal will consist of a wharf measuring 350 metres in length and a pond area measuring 60 metres wide, mooring caisson dredging, a levelled area covering approximately 11 hectares and all the systems necessary for the proper operation of the terminal.