Due to the earthquakes that affected the area of Tarapacá during April of 2014 and as a result of them, the berthing facility number 1 of Iquique Port was severely damaged, and the areas 1 and 2 became inoperable. The project of repair consists of the...

Principal actions: • Expansion of the Moll Central. • Installation of new levers. • Remodelling the current Moll de Ponent. • Remodelling the Moll de Ribera. • Dismantling of the existing petrol station at the Moll de Ribera and installation of a new one with higher capacity at the Moll...

The works of the bridge over the river Chagres in Panamá Canal consist of the construction of a new concrete bridge measuring 278 m long, with two lanes and 8 spans measuring 34.75 m high each. They also involve the execution of 382 m of...