Archive

The project consisted of the mechanical assembly of the new hydrocracker plant in the Cartagena refinery. Repsol supplied the equipment and piping and CPI Copisa Industrial supplied the auxiliary materials.   Scope of work: Custody, storage and installation of equipment. Brackets supply. Manufacture of brackets and piping...

The works consist of the prefabrication of piping, mechanical assembly of BOP (Balance of Plant) equipment, assembly of piping in the BOP and Power Island, thermal insulation and painting. The scope of the works involves the assembly of 392 tonnes of equipment, the prefabrication of...

The works consist of the prefabrication of piping, mechanical assembly of BOP (Balance of Plant) equipment, assembly of piping in the BOP and Power Island, thermal insulation and painting. The scope of the works involves the assembly of 392 tonnes of equipment, the prefabrication of...

The project developed in Mauritania, specifically in the Tasiast area, is part of the “Tasiast Optimization project”, which is an optimization and expansion project being carried out by the Canadian mining company through its Mauritanian subsidiary, Tasiat Mauritanie Limited, SA .   Main works: Construction of new facilities...

A mineral enrichment plant near the town of Zouérate (Mauritania) has been extended. The construction of the mine, which includes civil works, installation of the metal structure and all equipment and electrical installations, will occur next to the existing facility, therefore tripling the capacity to...